|
|
A section of the old molding is taken off and cut square.. |
Sheet metal is filed a little at a time to a close fit.
|
|
|
Metal Template is screw attached to wood back-up. Note the
patch I made. It beats starting
all over again. |
Water damaged section of ceiling and molding removed. New
metal lath applied with screws.
|
|
|
Mynor fills patch with moulding plaster and lime
and trowels smooth. |
Molding template is screwed to a sled. A wood
brace prevents chattering.
|
|
|
Carlos trues up the "screed"-the straight area
the template rides on- with a long mitering rod. |
Molding is filled a little at a time and run with
the template. The sled rides on a wood strip
nailed to the wall.
|
|
|
Edges and details are filled and tooled. |
Nice.
|