Ornamental plaster restored
Dupont Circle area
Washington, DC
A template, or running mold, is made to exactly match the old molding.
⇉ SEE HOW WE DID IT ! ⇇
Molding is run with moulding plaster and lime.
⇉ SEE MORE DETAILS HERE ! ⇇
Molding is straight and aligns on the money. Ceiling is stabilized with moulding plaster and repaired.
⇉ SEE HOW WE DID IT HERE ! ⇇
Missing flowers and vines are hand tooled with plaster.
⇉ CLICK FOR MORE INFO ! ⇇
Vines and flowers in another damaged area are hand tooled and match on the money
⇉ SEE HOW WE DID IT HERE ! ⇇
When this is painted, you shouldn't be able to tell we were here.
⇉ SEE MORE DETAILS HERE ! ⇇
Ornate ceiling was plastered in 1915.
⇉ SEE HOW WE DID IT HERE ! ⇇
Color cement stucco addition
in Rappahannock County, Virginia.
Chris shows off his new stucco.
⇉ CLICK FOR MORE ! ⇇
Color cement finish matches close to existing house.
⇉ MORE INFO HERE ! ⇇
Top of new window by a major manufacturer is level, in fact, slightly angled into the wall. The angle funnels water into the wall, deteriorating the stucco.
⇉ SEE MORE INFO HERE ! ⇇
Condition is corrected by putting on copper flashing, angled down deflecting water away from the wall.
⇉ MORE INFO HERE ! ⇇
Two, yes, TWO layers of tarpaper and self furring metal lath.
⇉ CLICK FOR MORE INFO HERE ! ⇇
Cement and sand finish is colored with paint colorant.
⇉ MORE DETAILS HERE ! ⇇
After 6 attempts, I made a color sample that was fairly close.
⇉ MORE INFO HERE ! ⇇
The view from my scaffold.
⇉ MORE INFO ABOUT THIS PROJECT HERE ! ⇇
Stucco over spalling brick
in Manassas, Virginia
Crumbling brick had been patched several times. These were bad bricks from the factory.
⇉ CLICK FOR MORE INFO HERE ! ⇇
A decorative white band forms a neat transition between the new stucco and the brick.
⇉ MORE DETAILS HERE ! ⇇
Cement basecoat is rodded off.
⇉ SEE MORE INFO HERE ! ⇇
Styrofoam is used for forms. Foam is just temporary. Forms are filled in with white portland and sand.
⇉ FIND OUT HOW WE DID IT HERE ! ⇇
The finish coat on the band is angled down along the top for water to run off. White offers a nice contrast with the bluish stucco panel.
⇉ MORE INFO HERE ! ⇇
Chimneys are us. Chimney is done about the same way.
⇉ FOR MORE DETAILS, CLICK HERE ⇇
Christ Church
The oldest church in Washington, DC
Addition built in the 1970's is leaking.
Castle like parapet wall has loose areas removed, and new flashing put over the edge of the roof membrane.
Loose areas and all horizontal areas are redone with colored cement and pebbles. We use an additive to make the mortar less porous.
Historic stucco church repaired.
Addition on another farm house
in Broad Run, Virginia
for R.E. Moore, Inc.
Original house was stuccoed in the 1940's over wood clapboard.
Finish coat is REAL white portland cement and REAL sand.
Patch and match
in Takoma Park, Maryland
Typical of our repair jobs, is this old house in Takoma Park.
A photo from 1900 shows the same house under construction. Note the old fire hydrant in the foreground.
A couple more
Spanish texture matched in Montclair, Virginia.
Pebble dash addition in Takoma Park.